Showing posts with label Rudder. Show all posts
Showing posts with label Rudder. Show all posts

Wednesday, July 12, 2023

Section 7 : Complete!

It's crazy to think that only a year ago I started this process of building.  Despite some breaks in progress for work, family, and other things, I am amazed that we have completed two sections at this point.  Now that we have finalized much of the "Workshop" setup, Storage arrangements, and time allocation, its time to get the ball rolling.

So back to the headline, the Rudder is done!  We last left off where we completed the trailing edge, mounted the counterweight, and now we finished the leading edge.  The leading edge is where the two skins are rolled together to allow the rudder to maintain its aerodynamic efficiency.  Section 5 which describes many of the basic techniques that are used in the build has a rather small paragraph about how to roll the skins together.  It essentially says to duct tape the skin to a pipe, roll downwards, and keep pressure on the spar.  After making the basic roll, you manipulate the skin to finish the roll.  After rolling it, you match drill the holes, debur, and rivet together.  It really makes it sound extremely simple, but I didn't find it as such,

Rolled Leading Edge Section

The RV-10 directions describe this step pretty simply, by telling you to do it in sections and use a 1.25" pipe.  That was about all the notes it provided.  When we did this at Synergy, it was on a small test kit which used a small broom stick.  It was all the same chord and didn't variate along he spar in width, the RV-10 spar varies along the length.  So suffice to say the practice kit wasn't as realistic as I would of hoped.   I tried the tape with a pipe, used a broom, and than man handled it a bit.  It ended up coming out pretty decently, and I was able to cleco the skins together.  I let them all sit for a little while in the form of the rolled joint, and then drilled them.  It was definitely not as simple or smooth as I would of expected based on some feedback online. 


Rolled Leading Edge With Cleco's


After riveting everything together, it was off to the races to clean up the skin.  I quickly wiped down all of the surfaces with some acetone to remove any oils before storage.  The Rudder is now moved into storage along with its counterpart, the Vertical Stabilizer.  I also removed the Horizontal Stabilizer parts from storage.  It was quite interesting since the Horizontal Stabilizer spars are significantly longer than the parts I have dealt with so far.  I ended up having to put them through the rear window of my pickup truck and hold onto them for the short ride home.  After some redesign of my workspace and cleanup, we are prepped to get ready to go on the horizontal stabilizer in the coming days.


Horizontal Stab Spar Ready To Go


Thursday, July 6, 2023

Rudder Trailing Edge and Counterweight Completed!

 So June was quite the whirlwind.  Between school wrapping up for the year, the kids being home part of the month, and work being extremely busy with summer travel starting, there was just not much time to build and keep my sanity.  I ended up taking much of the month off to spend time with the kids and focus on the things that needed the most attention.  Finally, after some time away and finding a free moment, I finally got to the trailing edge of the rudder this week.

Backriveting the trailing edge

My Cleaveland Tool kit had a squeezer attachment for the trailing edge included in it. I've heard some mixed opinions about the tool from the forums and other builders online, but I wanted to give it a shot myself.  I took the first rivet and tested using the squeezer attachment only and wasn't 100% happy with the result.  So I then went to the old fashioned method which was taught in the Synergy class and riveted with the mushroom set on some steel angle.  The steel angle made it easy as I didn't need to constantly reposition the rudder assembly over the small backrivet plate.  This allowed me to basically do one entire half at a time.  

Squeezing a few of the rivets that needed it at the end.

So my final setup to do this was the angle iron of steel on the table edge, the rudder over that, and then my wood and block on top to hold the rudder down.  This worked really well and I had mostly great results.  When I finished the normal back riveting, I noticed a few had a little proudness on the shop head, so I squeezed those and it finished setting them perfectly into the dimples.  So I think the final result was a hybrid of backriveting first and then squeezing to clean up the final result.  This seemed to be the best result, and sounded pretty much like what Austin did from Youtube.  

After taking on the trailing edge, I moved onto the rudder counterbalance arm.  This involved installing a counter weight, drilling my first nutplate, bending the skin to cover it, and then final assembly.  The directions spell out the method pretty well, but it takes a little finesse.  I bent the skin like it said, clamped the wood on it, and did the hammer method.  I wasn't thrilled with how many hits it took to get the bend desired, but it stated an 85% bend in the manual.  I got about there and then started working on the final bend and nutplates.  Using the screws to dimple the skin for drilling was a simple process that is pretty smart when you think about it.  I made the drill holes and dimpled everything up.  After I figured out how to drill the nutplate, it was smooth sailing.  Overall, I am happy with the final result, I am not sure if I should of made the skin a bit tighter to the weight, but I guess I'll find out down the road at final assembly.

Bending the skin around the Counterbalance Weight


Hammering the skin crease in.


After I finished the counter weight skin, it was time to roll the leading edge, the last step of the Rudder assembly.  Section 5 calls out for a 1 inch pipe, but the RV-10 manual says use a 1.25 inch pipe.  So a trip to Lowes was in order to get the correct pipe.  My reading, Youtube review, and other resources all have very mixed opinions on the pipe size and method.  I have seen some use clecos, some use duct tape, and others use brute force to get the roll.  It's not the most simplistic idea when looking at it, but I am sure I will figure it out.  So off to Lowes and then we will close out the Rudder for good.

Friday, April 14, 2023

Stiffeners Riveted and Trailing Edge Work

 The last month has been a bit busy with school breaks and getting the house ready for spring.  Lots of yard cleanup, Easter, and the kids being off have slowed down my time.  I finally got around to back riveting for the first time on the plane.  I utilized my two backing mats and put the back rivet plate between them.  This kept the parts at a good height without any major bend going over the side.  I see why some people like having a bigger plate or sink it into their table, but I think the ability to move the plate is more beneficial.  I noticed as you got to the ends of rudder skins, it was beneficial to just slide the plate down the table instead of the part.  Otherwise, you have a huge section hanging off the end.  Back riveting was pretty straight forward.


After I finished the back riveting I was rather impressed with how everything looked.  Time to start prepping for sealing and rivet the bottom rudder horn into place.  I took the recommendation of many people and ended using a pull rivet for the very last hole on the training edge of the horn.  It was way too tight and I tried more than once to buck and indirect rivet it with terrible results.  That was just way too tight a spot and I didn't want to slaughter the horn itself beating on it with the rivet gun.


After some time away from the project for the housework and the lack of a second set of hands, I finally got my father to come over.  He was going to be my second set of hands to hold the rudder skin while I joined them together.  The directions were pretty clear in describing the process, and we read through it a few times.  I ordered the cartridge style proseal figuring that one would be the perfect amount to utilize, but mixing that thing was a royal pain!  It took forever it felt like to mix thoroughly through using the little dowel and mixer in the cartridge.  After what felt like an eternity, we were ready to rock and roll.

Setting Pop Rivets in the stiffeners


I started with joining the base as instructed and pop riveted the first stiffeners.  Its pretty tight without severely bending the skin back, so it was easier to use a manual pull riveter.  I was really careful and layered the proseal as thinly as I could per the directions.  I tried to use a little roller at first, but that just gummed up and didn't do anything.  I ended up using a few popsicle sticks which I stole from my daughters craft bin.  That worked well and I had one which was snapped in half, so the pointed end was great to get into the tight corner against the skin.  After a long session of cleco's and pop riveting, the skins were joined and the trailing edge sealed.  

Trailing edge secured and curing

I utilized a technique that my Technical Advisor has suggested and others I have seen do online.  This was to go purchase a piece of aluminum angle iron.  This is a great and thicker straight edge which I used to support the trailing edge.  I utilized one rudder skin and marked all the holes and drilled the angle iron.  Afterwards, I deburred it and checked it to make sure everything matched.  This gave me a straight and stable edge to cleco the entire trailing edge to while I prosealed it.  Upon completion, I had it completely clecod to the angle iron and left it to cure for a few days.

The kids have been off this past week so no work has been done.  It was a good time to let the edge cure and solidify before I start cleaning out the holes.  Next week I will clear out everything and get to finishing up the rudder.  I'm hoping I can finish the rudder up before my trip next month, and then I will jump right into the Horizontal Stabilizer upon getting back.


Thursday, March 9, 2023

Trailing Edge Cleaned

 So the kids were off from school for a few days and things have been hectic at work.  I finally got around to removing the primer from the trailing edge area of the rudder skins.  A little MEK, a rag, and some elbow grease and it took about an hour to do.  I will definitely not make that mistake on future parts because I don't want to deal with that again.  Now to start back riveting this coming week!

Wednesday, February 22, 2023

Rudder Riveting Has Begun!

 So now that the priming is done, I have begun riveting the rudder together.  It began with the rudder horn and base pieces for the rudder.  This included riveting my first nutplate on which was neat.  I always contemplate which direction to put the rivets as the plans don't show it.  I know they tell you to put the manufactured head on the thicker piece, but many times the two pieces of metal are the same, so it is strictly just appearance?  I looked at a few other builders online and it seems like many times it didn't matter.

The rudder horn was pretty straightforward with the squeezer.  The squeezer is so nice to use, especially when doing multiple rivets of the same size.  You slowly tighten up the first one, and once you figure out the right depth, its rapid fire to get the rest done.  It easily repeats the precision of the first one and you can bang out a whole line rather quick.  If you have a second hand to remove the clecos and pop rivets in, it can be extremely fast.  

When I got to the rudder spar, I did have to drill out on rivet which I was not happy with.  The rivet was set and looked like it squeezed one side more than the other.  I am not sure if this is just squeezer being misplaced or not level perfectly.  I have to be a bit more careful to make sure I am dead on lined up as I go.

Rudder Horn and Spar Riveted

Rudder Skin Primer Removal (Oops!)

In other news I had explained my oopsy during the priming session in the last post.  I had broken the rudder trailing edge wedge and accidentally primed the entire skins.  My research showed I should have left the little edge unprimed to allow for better cohesion between the two skins, wedge, and proseal.  So I spoke with my tech advisor and he advised two options, first was to try scratching it off with bare scotchbrite.  I thought about this and remembered I had the scotchbrite wheel on the drill bit, its about a 1 inch wheel.  I took this and was happily surprised how the primer came off fairly easily.  However, it took me awhile and is very difficult to be exact as you go.

Scotchbrite Wheel Trial

So above is the piece I tried to clean up using the drill mounted wheel.  It really didn't go that great where I'd want to continue doing it for both skins.  It's a long piece and will take a really long time.  Option 2 presented was to get a can of MEK and use that as a solvent to help rub it off using scotchbrite by hand.  I am thinking of trying that option now as it might be easier to do.  It doesn't help that the dimples are a bit interesting to work around.  I will report on how this goes next week once I get some MEK and give it a try.  In the meantime, I am going to continue with getting ready to back rivet the skin stiffeners and get things ready to mount.  I am looking forward to my first back riveting and pull rivets on this coming up soon.

Friday, February 17, 2023

A New Tool, More Priming, and an Oopsy...

 Building has continued as of late and this past week was expected to be in the 50's and low 60's which is totally out of the norm for New York in mid winter.  As such, I made a decision to make sure I was ready to prime before the super warm day yesterday.  I had finished up all of the match drilling and had taken apart the rudder assembly.  The last step remaining was to countersink the trailing edge wedge.  Some builders reported doing this with a drill by hand, but that is a lot of holes to do.  In my cleaveland kit there was a jig designed for a drill press.  This allows you to setup a drill press, configure the countersink cage, and then repetitively drill through the wedge more quickly and efficiently.  And the wedge is kept perfectly at the appropriate angle to drill.  However, I don't own a drill press.... yet.

I had a nice gift card for Lowes leftover from Christmas and decided that it was time to put it to good use.  I went to Lowes and picked up their countertop drill press from Porter Cable.  I already have the band saw and grinder, so it fit in perfectly to my collection.  I got it home, took some time to assemble, and was ready to start countersinking soon enough.  Add in some small clamps and I had the press all rigged up and ready to go.

Drill Press with Trailing Edge Jig

It took me two sessions to do, but I slowly made my way through both sides of the trailing edge wedge.  This part is thin but has an important job of joining the two skins together when I do the final assembly.  I took my time getting the first few holes setup and making sure they fit my test dimple plate perfectly.  After fine tuning the cage, I was off to the races to finish the rest of the wedge.

Nice Countersink Holes

Now that the wedge was finally countersunk, I was all ready to get started priming on Thursday.  I woke up to the temperature already in the high 50's and got setup early.  I used the same setup with my priming racks over the 2x8's.  After getting the kids off to school, it was time to bust out the Ekoetch and start scrubbing.  The etching is very time consuming and tedious work to get done, but its nice cleaning everything up.  Again, its not a big deal to have lots of scratches as this helps the primer bond to the surface.  The unprimed outer parts will eventually be sanded and scratched up when they are ready to paint.  As long as we have no large and deep scratches, we are good to go.  I have to figure out the best way to protect the skins a bit when moving them around the racks.  My racks have chicken wire on top and make some small scratches.  

I had one hiccup or oopsy during my etching session.  One of the last pieces I etched was the trailing edge wedge.  Now doing this was a mistake because we don't want to prime this as it can effect the adhesion of the Proseal when I build the rudder.  But as I was scrubbing the wedge with the scotchbrite, the wedge literally snapped in my hand.  The wedge is so narrow, just gentle pressure caused it to bend and snap.  I now have to recut and redo the countersinking. I am not looking forward to shipping a piece of trailing edge by itself.  I might wait until I order the fuselage and include it in that if I don't have enough pieces.

Snapped Trailing Edge

Priming wasn't too big of a deal.  I gave everything a very thorough stir and made sure to mix it well.  I still like my little detail paint spray gun, but as we get into bigger assemblies, I might need something larger.  I had to replace and refill the spray tank once during the session.  I'd prefer to avoid doing that mid spray if I can.  After everything was done, I broke it all down and got everything cleaned up.  Next week I will start riveting together the rudder pieces for the final time.  This section will be an introduction to back riveting and my first time using Proseal.  I look forward to the new processes.




Tuesday, January 17, 2023

Let There Be Heat! And Building Resumes...

Heat in the Garage

 Well after a two month hiatus due to bitter cold temperatures, my workshop has received an upgrade.  We have run a fresh line for power and installed a mini split in the garage.  Now my garage is not 100% insulated as the outer walls are not shared to living space, so I had to insulate whatever I could.  I insulated the ceiling space, front doors, and cleaned up the weather stripping to insure I am as tight as I can be without drilling into the walls.  After that was done, my HVAC friend came by and installed our new mini split.  I am not expecting 75 degrees in the winter, but keeping the room above 60 makes it comfortable to work out there and not be freezing.  I gave it a quick test the other day and I am quite happy so far.  It will also be nice in the summer if its scorching as I can cool the garage as well.  Back to work now!

Let there be heat....

Christmas Tool and Workshop Additions

In other news, Christmas came and I added some new tools to the collection.  I know there are plenty of tools and parts that I will purchase over the life of my build, so I have started to compile a list of everything I will need over time.  I am starting with some basic tools and will buy some parts as I approach needing them.  However, my family has come through and picked up some basic tools for Christmas.  I now am a proud owner of a soldering iron, label maker, 12" offset back rivet set, and some extra countersink cages.  These will all be quite useful and helpful as my build continues.  I am going to continue updating my list of things and hope that my future birthdays and Christmas' will help lighten the hit to my wallet.  

My Wife's Christmas Gift to Me.

One thing that I was super excited about was a surprise gift from my lovely wife.  We all know that the spouses will either make or break any home build, but mine has been amazing.  From the minute I asked to do it, she has been supportive and willing to help anytime I need.  Now, I haven't had to have her crawl into the tail cone yet, but I think she will do so without issue.  She purchased me a sign for the workshop that I cannot express my gratitude.  I am so happy and have mounted it on the wall right above my workbenches.

Building Resumes....

I've continued to build on the rudder section.  I began where we left off with match drilling the entire rudder skins and substructure.  I have now disassembled and labeled the skins.  I got to break out a new tool and play with that tonight.  The new tool is the Cleaveland Edge Forming Tool.  I broke it out of its plastic finally and played with it on the scrap pieces I have.  The directions were not very detailed, it only said don't over do it, but the website for Cleaveland had a short video describing how to adjust and do it.  I still am not overly thrilled by the video, but it is good enough.  The real question is trying to determine how much is overdoing it.  I might reach out to my tech advisor to discuss this briefly before doing it.  So thats where we will continue next, edge forming and deburring for priming.

Rudder structure all built and match drilled...  Time to take it apart now...


Thursday, December 1, 2022

Storage and Heat..... Who Needs That?

 So My rudder is assembled and ready for the match drilling of ribs.  However the last month has been quite hectic with the holidays and winter approaching.  I haven't been in the garage too much because the temperatures have been getting down to the 30's and 40's, making for a very cold work session.  It's very difficult to work with fine motor skills at such low temperatures.  I have been in the process of getting quotes to install a mini split into my garage so I can make the workshop reasonable.  For those that don't know me, my attached garage is a 2.5 car garage and I prefer to avoid the flammable liquids/gases based systems.  As a firemen, I have seen numerous occasions of Carbon Monoxide poisoning in homes where these types of heating systems do not operate properly or the room doesn't ventilate well.  So I hope to have this heat settled in the next two weeks or so.

In other news, my wife has been on my case about getting her garage back for the winter.  With the fear of winter snow coming, my wife would like to be able to park in the garage during a storm.  As a result, I've been searching around for the best options for off site storage.  Most of the storage solutions near me are fully packed or only have smaller units.  After some searching and luck, I happened to come across a storage place who just actually had a tenant move out the day before.  This allowed me to snag a larger unit which gives me room to grow as the plane gets larger.  This also allows me to open up floor space as I build further into the project.  So I am hoping to be back on the bandwagon shortly and get the rudder finished up.

Thursday, November 10, 2022

Rudder Match Drilling Prep and Storage Concerns

 I have been a bit busy with life the last two or three weeks.  Between work and family stuff, I haven't had a significant amount of time to get outside.  I also started to realize I need to plan for the winter accordingly.  My garage is insulated for the most part but has no heat source currently.  I am waiting for some quotes to get a Mini Split or Heater installed to allow me to work out there in the winter months.  It get a bit hard to work fine motor when its 30 or 40 degrees out.

Another thing I have realized is my wife wants her parking spot back.  My wife is very understanding and allows me to utilize the entire garage during the majority of the year, however, winter is coming.  As such, the boss has ordered me to make space for her car in prep any snow events.  As such, I spent a lot of time calling around to local storage places looking for a medium sized unit.  I figure if I can get rid of the two large crates, I can easily fit my wifes vehicle in the garage when needed.  However, finding a unit was a serious struggle.  Most of the ones I can find are very small and won't work for my needs, and the larger ones have one of two issues.  One issue was they were inside units with tight hallways to access, I didn't want to risk swinging a flight control or large part and denting it when I don't clear something.  Also, many of them were simply unavailable.

I eventually struck a bit of luck and happened to check a unit in the next town.  I asked about mid size units, but the only thing open was a large unit, which literally became available that day (it was the first of the month).  Since I haven't been able to find anything, I decided to take it.  My thought process was I have some extra space in back for some household stuff, but I have the large unit to grow into as I finish other parts.  It also will allow me to store some racks for small parts in a more organized way.  And I am buying some saw horses to build some "skin tables" to store skins flat until needed.  I am hoping to have the unit setup and everything moved sometime next week, which will allow me to focus on the rudder again.

In the meantime, I was able to finish the rudder prep and have the skins placed for match drilling.  This process wasn't terrible, lots of little prep work.  Separating the stiffeners and lots of deburring was in order to get to this point.  I constantly am debating about the level of deburring, many people seem to argue online about how "smooth" or how perfect things should be.  I find the cut pieces are a bit less precise but the stamped parts are pretty straight forward to deburr.  I don't feel any major sharp points or anything, so I think I am doing ok.  

Lots of deburring to get the structure together.

After a long deburring session, I got to clecoing the skin together.  It's amazing how precise the kit is, and match drilling should be pretty straight forward.  Another thing I am still trying to figure out is how crazy I need to be.  On the vertical stabilizer, I would simply run the drill in and out quickly, most parts were not taking much if anything off at all.  So do I need to waste time with this step every time or now?  The plans aren't updated to reflect what parts are final sized or not, so I have been cautious and making sure to do it quickly.  I guess this makes a more exact part anyway and makes riveting easier.  Should I just be reaming everything instead?  What do you guys think?

Rudder skin cleco'd in place.

So that's where I stand right now.  The rudder hasn't been too terrible, but I am looking forward to my first back riveting experience which will be coming soon.  Time to get back out there this week.

Thursday, October 13, 2022

Chapter 7 Begins : The Rudder

 So we have completed the last remaining step of chapter 6 and have officially broken ground into chapter 7.  Chapter 7 is the Rudder, which will be mounted eventually to the back of the Vertical Stabilizer from chapter 6.  This piece uses some different and new building techniques which I did not get to use in chapter 6.  During this chapter I will do a bunch of backriveting, some pull rivets, rivet a trailing edge, and roll a skin.  I am looking forward to this, the only thing I didn't do in my fundamentals class was the actually adhesive that goes in the trailing edge.  On that note, I should go order that soon so its here when I get to that point.

Today I pulled out the beginning parts and got organized.  The first few steps of chapter 7 have me labeling the cut lines for separating the pieces.  Many of the pieces come together as on larger piece, and some need to be cut apart or trimmed down.  The directions are very clear and make the process easy, its just a tedious job making sure to line things up.  I wish I had a metal break as the did in Atlanta, but the cost isn't conducive to my light use.  Here are the pieces I had marked up which are ready for cutting.  This took me a little over an hour to get done.  Next session will be cutting and deburring all of these parts down. 

Marked Rudder Pieces - Pre-Cutting

Marked Rudder Pieces - Pre-Cutting

Another item on my to do list is to finish organizing the parts.  I have honestly been debating getting a storage unit but that is going to be about $150 a month.  I really don't want to do so yet but spaces are limited around my area and I don't want to miss out on the right size one.  Optimally, the unit will be large enough to store the bigger pieces as I finish them and other parts I don't need yet.  This will also free up much more garage space to allow for work once I get to the tail cone and bigger pieces.  I have to make some calls and see what's available.

Airventure 2024 Recap

 So Airventure just passed and the annual pilgrimage to Osh Kosh has ended.  They reported over 13,000 aircraft operations over the course o...